Structural condition assessment of a confined, below-ground on-site detention tank.

A structural condition assessment of the underground on-site detention (OSD) tank at the Tugun Bypass tunnel — a confined, below-ground reinforced-concrete water structure that is rarely seen and easily overlooked until it starts to fail.

Our engineers planned confined-space access, then assessed the concrete condition, reinforcement corrosion and water tightness of the tank, and reviewed its structural adequacy and remaining service life. The result was a prioritised set of remedial recommendations the asset owner could act on to keep the structure performing.

Services provided

  • Remedial Engineering
  • Structural Engineering

Scope of works

  • Structural condition assessment of the underground on-site detention (OSD) tank
  • Inspection of a confined, below-ground reinforced-concrete water structure
  • Assessment of concrete condition, reinforcement corrosion and water tightness
  • Review of structural adequacy and remaining service life
  • Confined-space access and inspection planning
  • Prioritised remedial recommendations for the asset owner